sales@hamxera.com +86 177 5002 2789 Mon–Sat, 08:30–18:00 (GMT+8)
WhatsApp

Quality & certifications

A radio fails in the field, not in the datasheet. Our test sequence is built around the failure modes we have actually seen returned — audio, battery, antenna and sealing.

Inspection flow

Five gates, one record per unit

Every unit has a retrievable test record: incoming batch, aging result, calibration data and final inspection verdict. Bulk orders ship with a sampling report.

01

Incoming goods

Battery cells, PCBs, housings and speakers sampled per AQL; supplier batch recorded against the work order.

02

In-process

Solder joints, shielding, antenna VSWR and assembly torque checked at each station.

03

Aging

8 hours powered at rated load in a temperature chamber; failures pulled and analysed before packing.

04

RF calibration

Power, frequency error, sensitivity and adjacent-channel rejection tuned and logged per serial number.

05

Final & packing

100% functional test, audio check, cosmetic inspection, then carton audit with photo record.

Certification files

What your tender and customs file needs

The documents below are available per model as PDF. For private-label projects, some certificates must be re-issued under your brand — allow 4–6 weeks.

Request document pack

Scope and validity are governed by the certificate itself — confirm model coverage with us before submitting a tender.

Reliability

Four tests we run beyond the standard

Standards ask for a pass. We care about year three. These run per batch and are written into the shipment report.

  • 1.5 m six-face dropWith battery and antenna fitted; audio and sensitivity re-tested after the drop
  • 100,000 PTT cyclesPTT and side keys cycled on a fixture, contact resistance monitored
  • Thermal cycling−20 °C to +60 °C cycles, checking sealing and cell swelling
  • 48 h salt sprayFor coastal and marine buyers — metal parts and connectors inspected
  • Field validation
    Audit & claims

    Third-party inspection welcome; defect rate written into the contract

    SGS, BV and TÜV inspections are welcome at the buyer's cost. Bulk contracts can fix a defect-rate ceiling and a replacement clause within 30 days of arrival.

    Next step

    Need a document pack for a tender?

    Send the tender reference and the required document list. We assemble the matching certificates, test reports and datasheets into one PDF pack.

    Chat on WhatsApp